Pictures taken during the constructional phase:

 

     Initial excavation -

CPond1.JPG (65121 bytes)

                          

    Griff working on

    the foundations -

    

CPond.JPG (76621 bytes)

"You won't get me to climb inside that thing!"

    Building the new culvert was

    one of the most costly parts 

    of the process -

           

 

A gravel layer was laid

to provide an even bed 

for the liner - 

                CPond2.JPG (65443 bytes)

Finally the liner was laid - 

               CPond4.JPG (75398 bytes)

      Presentation of the cheque from

    Wessex Water -

Cheque.JPG (57519 bytes)

Home Page